Client Project Name
Property Conditions Report
Address Line 1
Address Line 2
Property Report
General Information
3Shul Job #:
SiteOne Branch #: 0000
SiteOne Branch Name:
Property Address:
Date Prepared:
Site Information
Property Description:
Property Type:
Weather Conditions:
Outdoor Temperature:
Soil Condition:
Utilities On During Inspection:
Site Grading:
Vegetation/ Landscape:
Retaining Walls:
Driveway Materials:
Walkways & Paths:
# of Parking Spaces:
Accessible Parking Spaces:
Accessible Path of Travel to Entrance:
Additional Accessibility Notes:
Overall Site Accessibility:
Overall Site Condition:
Record Floor Plan
All property conditions reports are conducted with the intent to document the existing conditions of the site and building through visual inspection and the use of instruments. While we strive for accuracy, these reports reflect our findings to the best of our abilities.*All scores are based on a scale of 1-10 and are as objective as possible. Please note that all data should be independently verified by the owner, contractors, and subcontractors prior to any work being undertaken.3Shul and its entities expressly disclaim any liability for errors or omissions in this report. Users of this report and associated attachments acknowledge that reliance on the information provided is at their own risk.Surveyors will only inspect items that are at ground level and within arm’s reach. The surveyor will not be able to climb or access items that are above this reach. This limitation ensures safety and compliance with inspection protocols.